Lever hoist is a simple to use and easy to carry the manual lifting tool. It can be enhanced traction, down, calibration and other operations. Weight is generally no more than 50T. Widely used in shipbuilding, electric power, transportation, construction, mining, telecommunications and other sectors of the equipment installation, lifting items, mechanical retraction.
monorail wire rope hoist
2015年2月6日星期五
Line daily management measures hanging
Line hanging as an important architectural works of lifting equipments, in order to ensure the safety of everyday use, the relevant line hanging units must develop a good use of appropriate management practices. Here in Shandong line hanging our sales and after-sales experience for everyone daily management measures introduced hanging downward:
First, everyone should carefully check the vehicle in front of machinery and equipment, spare parts and security guards the integrity and reliability. If the main accessory controller, brake brakes, bells, emergency switches and other failures, should be promptly addressed.
Second, the members must obey the command signal, but anyone issued an emergency stop signal line hanging, should immediately stop the running time between the crane and the crane, to maintain a certain distance.
Third, the driver must be in the command signal, only to confirm the operation, before the driver should-ringing, when approaching the winch, limit the size of the car driving near the end or close to each other, slows down.
Fourth, safe passage should provide special sites or escalator, walk up and down. In addition to repair rail cars were not allowed to go out for a walk both sides. Walking railcar is strictly prohibited. Allowed to cross from one line to another line hanging hanging.
Fifth, when the line stopped gantry cranes, lifting objects shall not be suspended in the air. During the operation, floors or warning bell should hang out. Disable items at the top of people's heads.
Six, maintenance line hanging when looking for a safe place to tilt, turn off the power, hang warning signs. Ground fencing and hanging the "no entry" signs.
Seven, became a tonnage heavy objects, you should try hanging slightly off the ground, in order to confirm the suspension stability, good brakes, and then rise slowly run. Not handle three control operations.
Eight, line hanging sudden power outage, you need to switch lever to "0". Driver can not leave the cab when not lay down or unlock pieces.
Nine, in case of open-air line hanging storm, lightning, or six more than the wind should stop working, turn off the power, the front and rear wheels should match the pad cards firmly.
订阅:
博文评论 (Atom)
没有评论:
发表评论