Building basket special lever hoist installation

Construction work at heights basket by HSS-16QT  lever hoist ,  SLS3.0 safety lock, steel basket and suspension mechanism four segments. The following detailed description of your special lever hoist basket on how to install.
Construction basket in the special lever Hoist equipment  prior to installation, carefully read the instructions, check the no-load continuous flip lever hoist lever forward and reverse lever in its full range of motion should be flexible, light, no obstruction phenomenon.
Check the safety lock lever when the flip is flexible and reliable.
Suspension mechanism installed as shown, the coupling screws should be tightened and reliable. With heavy rail as shown laying the bump slot should be a good bite to prevent them from loosening, counterweight not less than 1t.
Wire rope pulling manual hoist  penetration before twisting yellow insurance, and then push the loose unloading moving forward to the dead point, it directly stuck so far. The end of the guide wire from the penetration, then loose unloading levers to the original position, then push pull automatic back will loose unloading system lockup.
Security lock installation; rope through the first safety lock safety lock, and then figure can be installed, move up and down and flexible.