Electric sports car run a speed test on the track (beam) is not less than 2M together on the highlights of each given tag, when the electric sports car that is running to mark start time and run to another timing mark is terminated, repeated four times, respectively for speed average.
Electric
wire rope hoist parked in the main beam span, and gradually add to the chorus of 1.25 times the rated load, load rises from the ground 100 - 2011MM, vacant 10min, after uninstall electric sports car open to the ends of the main beam and then check whether the main beam permanent deformation. Repeat three times, allowing Xuzhu Liang 1,2 times a little deformed, 3rd main beam should not produce permanent deformation. Test will open to cross-end electric sports car, check the main beam is indeed camber.
For electric hoist gantry crane electric
load chain should also make stops at each girder cantilever effective at both ends, and gradually loaded to 1.25 times the rated load, load rises from the ground, floating 10MIN, electric sports car after uninstall legs open to the main beam at check the main beam in the presence or absence of permanent deformation.manual hoist Repeat three times, the first and second rounds to allow mutual understanding and a little deformed, 3rd main beam shall not produce permanent deformation.
没有评论:
发表评论