1, two-speed electric chain hoist installation need to install Winders
2, Connect the power cord to connect the power cord, the power must be cut off in advance. Meanwhile ground should be well grounded, otherwise the operator touching any part of the chain hoist or when, may feel a shock feeling.
3, lubricate chain hoist load chain, chain lubrication extent affect the load chain is an important factor in life. Timely and effective lubrication of the load chain, in order to ensure the effective life of the chain.
4, check the chain arrangement,load chain for multi-line chains, two-speed electric chain hoist, the hook should ensure that the next frame will not be overturned. If overturned, restore it to its normal state, to ensure the chain of weld arranged in rows. Do not twist the chain hoist hanging on the load.
5, check the operating voltage due to electric chain
lift hoist factory, is based on a user-specified voltage or high voltage equipment, such as 230/460V, need to check the wiring and verify contentment supply voltage requirements. If not, please refer to the instruction sheet to be corrected in order to meet the required operating voltage requirements.
Two-speed electric chain hoist installation Tips:manual block Install two-speed hoist, if the voltage at inappropriate manipulation might be caused by severe electric chain hoist damage. In order to prevent this situation thrown, it is necessary to ensure that the necessary wiring meet power requirements.
Lever hoist is a simple to use and easy to carry the manual lifting tool. It can be enhanced traction, down, calibration and other operations. Weight is generally no more than 50T. Widely used in shipbuilding, electric power, transportation, construction, mining, telecommunications and other sectors of the equipment installation, lifting items, mechanical retraction.
monorail wire rope hoist
订阅:
博文评论 (Atom)
没有评论:
发表评论